|
|
The back end lined out and cabled up! |
|
Awaiting batteries, inverter and electrical switch-gear |
|
View showing decoration on rear doors. Note that flip-seat is stowed and slide is closed |
|
|
View showing flip-seat deployed. Note Heart Freedom 25 Inverter/Charger (soon to be replaced) and landline/PropGen auto switch below |
|
Another view of stowed flip-seat and Freedom 25 |
|
View from steering position looking back down into cabin |
|
|
Tiller arm stowage |
|
Engine control panel and electrical panels |
|
View looking back into rear cabin/office |
|
|
Porthole lined with turned chestnut and glazed with star-cut glass |
|
Office desk and shelving, awaiting computers! Note cable slot at rear of worktop |
|
Before installation of the desk. Note 230v, 12v and TV coax sockets below desk and Link 1000 Inverter/Charger remote above. |
|
|
Looking forward in office - shelving and cupboards under construction |
|
Prop-shaft being installed under the office floor. Note silencer top left |
|
View showing battery box in place and calorifier installed to right |
|
|
Silencer, ready to be insulated and boxed in |
This page created on a Macintosh using PhotoPage by John A. Vink.