Rear cabin and steering position

Loading...
(76K)
The back end lined out and cabled up!
Loading...
(70K)
Awaiting batteries, inverter and electrical switch-gear
Loading...
(20K)
View showing decoration on rear doors. Note that flip-seat is stowed and slide is closed
Loading...
(140K)
View showing flip-seat deployed. Note Heart Freedom 25 Inverter/Charger (soon to be replaced) and landline/PropGen auto switch below
Loading...
(21K)
Another view of stowed flip-seat and Freedom 25
Loading...
(21K)
View from steering position looking back down into cabin
Loading...
(15K)
Tiller arm stowage
Loading...
(19K)
Engine control panel and electrical panels
Loading...
(17K)
View looking back into rear cabin/office
Loading...
(14K)
Porthole lined with turned chestnut and glazed with star-cut glass
Loading...
(16K)
Office desk and shelving, awaiting computers! Note cable slot at rear of worktop
Loading...
(15K)
Before installation of the desk. Note 230v, 12v and TV coax sockets below desk and Link 1000 Inverter/Charger remote above.
Loading...
(17K)
Looking forward in office - shelving and cupboards under construction
Loading...
(21K)
Prop-shaft being installed under the office floor. Note silencer top left
Loading...
(18K)
View showing battery box in place and calorifier installed to right
Loading...
(17K)
Silencer, ready to be insulated and boxed in

This page created on a Macintosh using PhotoPage by John A. Vink.